MV/LV substation revamping + PV, Tier 1 ceramics

MV/LV substation revamping + PV, Tier 1 ceramics

Complete substation refurbishment with PV integration

The challenge

[Placeholder text] Refurbishment of an existing MV/LV transformer substation with integration of a photovoltaic system, ensuring operational continuity during the works.

The solution

[Placeholder text] Integrated design, supply of switchboards and Power Center, PV integration and energy monitoring system.

The results

[Placeholder text] Greater reliability, reduced consumption and maintenance. Real data and images to be provided by the client.

Do you have a complex industrial project?

Talk to our engineers for a feasibility analysis.

contact us